Tuesday, February 5, 2008

Corrugated metal siding installed

Report and photos by Dennis Casebier

The Cordova team have continued to wrap the building, install lap siding, and install the corrugated metal siding on the east side of the Freight House. Also, most of the doors are installed.

On interior work, the crew has installed some ducting for air conditioning and heating in the ceiling of the first floor of the Depot.


Lance Cody of Hi-Desert Air and his crew of three or four showed up in the late afternoon and began laying out the air conditioning.

It has been tough working out there all day in the cold wind. Mostly sunny though. I'm hopeful they'll get a break in the weather soon.

They have two lifts on the site but they can't use the original one because it's less stable in the wind and could potentially blow over.