Saturday, March 17, 2007
Thursday, March 15, 2007
Power House roofed
From the Mojave Road Report
Ron Shepard and John Reiff put roofing on the new Power House.
Ron Shepard and John Reiff put roofing on the new Power House.
Wednesday, March 14, 2007
Pump House pour
From the Mojave Road Report
John Harrington, John Reiff, Ron Shepard, and Carl Weikel poured the concrete slab for the new Pump House and also a step at the new Power House.
John Harrington, John Reiff, Ron Shepard, and Carl Weikel poured the concrete slab for the new Pump House and also a step at the new Power House.
Friday, March 2, 2007
Pump House preparation
From the Mojave Road Report
John Harrington commenced work on the foundation forms for the Pump House that will support the new well. John Reiff finished restoration fo the Slaughter cement mixer. Its first job will be to pour the Pump House foundation.
John Harrington commenced work on the foundation forms for the Pump House that will support the new well. John Reiff finished restoration fo the Slaughter cement mixer. Its first job will be to pour the Pump House foundation.
Monday, February 26, 2007
Power House roof
From the Mojave Road Report
Ron Shepard and John Reiff worked on installing the roof for the Power House.
Ron Shepard and John Reiff worked on installing the roof for the Power House.
Wednesday, February 21, 2007
Power House construction begins
Report and photos by Dennis CasebierWednesday
We procured the materials for the 10' X 12' Power House yesterday. Today "The crew" went to work on getting the wall framing up and most of the wooden materials. From left to right; Bob Beal, Dorothy Beal, John Harrington, Ron Shepard, John Rieff.
They also painted the structure with an undercoat as protection against warping. Hope we have another nice day tomorrow!
Tuesday, February 13, 2007
Well concrete collar poured
From the Mojave Road Report
Eagle Well Drilling was here with a concrete truck Barstow. The concrete sleeve that must be poured alongside the casing down fifty feet was poured. They also poured the concrete collar and pad at the new well site.
They brought a full load of concrete when only half was needed. The rest was used by John Reiff, Ron Shepard, and Carl Weikel who were busy pouring cement for the new Power House slab and other projects around the property.
Eagle Well Drilling was here with a concrete truck Barstow. The concrete sleeve that must be poured alongside the casing down fifty feet was poured. They also poured the concrete collar and pad at the new well site.
They brought a full load of concrete when only half was needed. The rest was used by John Reiff, Ron Shepard, and Carl Weikel who were busy pouring cement for the new Power House slab and other projects around the property.