Showing posts with label Morris Swain. Show all posts
Showing posts with label Morris Swain. Show all posts

Thursday, March 27, 2008

Ready to go

Report by Dennis Casebier
Photos by Dennis Casebier and Roger Mitchell


Today, the "A" Team, consisting of Phil Motz (in charge), Gail Andress, Gus & Stella Lind, and Morris Swain assembled on the west side of the Library/Depot with all the materials in hand to install the septic system that will support the new facility.

At the controls of the Jack & June Greening Tractor, Gail Andress did the digging, with shovel accompaniment provided by the Linds and Morris Swain.

With the big hole dug, Gail lowered the new 1,000 gallon septic tank into the hole.

Meanwhile, the crew had the sewer line ready to connect from the building.

Gail then dug the ditch for the 50-foot leach line and dumped the required amount of leach rock in the bottom. The leach line was laid on the rock and more rock placed on top of that -- according to code.

The job will be finished tomorrow by laying newspaper on top of the rock on top of the leach line. Then the whole thing will be covered with dirt.

While the leach line was being laid the new septic tank was filled with water. Next thing you know, we'll be almost "ready to go," so to speak.

Wednesday, March 12, 2008

Tanks, a lot

Report and photos by Dennis Casebier

We are experiencing beautiful weather. Our high temperature today was over 80 degrees with only a breeze. Things have been pretty quiet around the construction site for the past several days, until today.

Rudy of C & R Tanks of Tulare, CA arrived at about 10:00 AM with our truck load of tanks. We led him in through the service entrance and up to the job site. He nosed his big rig out towards the Stotts Stamp Mill gate and then backed in along side the pad constructed by Gail Andress where the two 5,000 gallon tanks are to go.


The straps were removed from the three round tanks, they were rolled off, shifted into position, and set down. The whole process took no more than 30 minutes. We positioned the big tanks so their fill holes and drains line up with about six feet between them. This will facilitate getting them all hooked up to the water system.


For the fourth tank, the 1,000 gallon septic tank, a different procedure was used. Gus and Morris put straps around the tank then lifted it off the truck with the Greening Tractor. The tank was then moved over near the spot where it is to be buried.


The total delivery was of two 5,000 gallon water tanks for fire fighting purposes, one 2,500 gallon tank for potable water, and one 1,000 gallon sepic tank.

Thursday, February 21, 2008

Outside painting finished

Report by Dennis Casebier
Photos by Chris Ervin

This was quite a day. As previously reported, the Case backhoe tractor was down due to the failure of a seal in a hydraulic piston. Gail Andress got up early this morning so as to be at the Case tractor parts place in Las Vegas when they opened at 6:00 AM. He bought the necessary part and then high-tailed it for Goffs.

Gail arrived here at 7:30 AM and then he, Gus and Stella Lind, and Morris Swain worked for four hours to get the piston repaired. And, lo and behold, it worked just fine! (Gail said he used to make repairs like this all the time, but he hadn't done one in 40 years!).

The crew was back out there right after lunch. They dug a trench along on the west side of the building adjacent to where the stairs will be, laid the water pipe, connected a pipe to the input to the new building, and got it all covered back up again. It was getting dark by the time the job was finished. It was necessary to get that stretch of pipe laid because Mr. Cordova plans to work at that spot tomorrow to build the stairs.

The plumber was here today running a line into the attic for humidifiers. He made other adjustments to the water system.

The painters finished with outside painting today. They finished all the yellow and green.

Mr. Cordova thinks the roofers will come out soon to get the tar paper on the roof to make it water proof. He will call early tomorrow morning to get a weather check before sending the roofer out.

The weather today was pretty good. Not especially cold early-on, but by late afternoon there was a stiff breeze out of the west and it was colder.

Spirits are high at Goffs as this beautiful new building comes into focus. A lot of good work was done at Goffs by a lot of good people today.

Tuesday, February 19, 2008

Painting and padding

Report and photos from Dennis Casebier

The painters showed up at 7:00 AM this morning. The weather was nice and continued nice all day. The temperatures got up to 70 degrees with little or no wind.

There are two painters: Brandon Bates and Rich Hernandez. As with everyone that has come out to work on our project, they are really nice guys and very competent. They painters worked through the day until 5:30 and got a lot done.

There's a lot more yellow on our beautiful new building than there was early this morning. They will be back early tomorrow and we can hope the good weather will continue.

Gail Andress arrived on site at 7:30 AM this morning. He manned the tractor and, assisted by Morris Swain and Gus Lind, worked all day to build the pad that will hold the two 5,000 gallon water tanks. It took all day.

Gail plans to be back tomorrow morning early and the day will be spent digging ditches and laying pipe. So we're beginning to make progress on the water system.

We're going great guns at Goffs!

Monday, February 18, 2008

Painters arrive

Report by Dennis Casebier

It was about 35 degrees on the front porch at 6:30 AM. There's a bit of a breeze this morning.

As I come back south on and along Lanfair Road I always angle over and walk through the construction site. I was surprised to find the painters there getting ready for several days of painting.

The guy in charge is Brandon and his work force is Rich. Nice guys. As a convenience to us ditch diggers and backhoe operators, they are going to do the west side fist since we have a tentative plan of laying a 2" water line along there tomorrow in a ditch to be excavated by Gail Andress.

As I understand it the weather should be clear through sometime Wednesday or Thursday when some kind of system might come in. Hopefully they'll get the painting finished.

This morning Gus and Morris are busy moving scrap lumber away from the construction site out to the lumber yard so it won't be in our way when we are digging tomorrow.

Saturday, February 16, 2008

Picking up the wood scraps

Report by Dennis Casebier

Well, the Cordova crew is gone. And guess what? We're having the most beautiful day we've had in a long time. It got up to about 70 today and no wind! Now isn't that the way it is. Those poor guys have been struggling out there against the wind for weeks. Then they leave and the next day is like spring!

Gus and Morris have begun moving the lumber scraps. We are laying claim to them to use for firewood in the schoolhouse. So they are using the big bucket on the tractor to load the lumber scraps and take them to the lumber yard on the 5th segment. They'll have to dry out a bit before they will make good firewood. But there's a lot of scraps so we've got something of a windfall there.

Otherwise, nothing to report on the Library/Depot construction project today.

Saturday, January 19, 2008

Electrical wiring has been pulled

Report and photos by Dennis Casebier

Sacrifices in the face of adversity are becoming commonplace around here.

By the terms of our agreement for construction of the Library/Depot, we are required to run an adequate power line up into the new structure. After that, General Contractor Cordova is responsible for electrifying the building.

As those of you who are following this project know, we arranged with Southern California Edison for a 400 amp service for the new building. This was accomplished last year through a major effort on the part of our own director-electrician Phil Motz and the assistance of several other volunteers. The 400 amp service was brought in and is at the ready in a new Power House that was constructed by our volunteers.

The immediate remaining challenge was to get that power conveyed underground from the Power House some 200+ feet to the Library/Depot building. This past week Gail Andress came over from Nelson, Nevada and used our backhoe to dig a ditch for the required 2" conduit line. Phil Motz and others laid the conduit and then the ditch was covered.

The final task was to get three strands of "000" power line and a smaller ground line through the conduit. Phil laid his plans carefully for this but got skunked by the severe weather Thursday and Friday of this past week. It was just too cold and windy. Not only that, but we are up against a time schedule because Phil is poised to return to Indiana this coming week.

So, taking advantage of a bit of softening in the temperature and wind, Phil and his crew tackled the job today. In addition to Phil, his team consisted of; Gus Lind, Morris Swain, Dorothy Beal, Bob Beal, and Hugh Brown. Working aginst difficult odds and adverse weather the job was accomplished today.

If you go out there to the new Library/Depot building, you'll see the wires coming out into the building right where they are supposed to be. Then, walk a couple of hundred feet to the Power House, where the 400 amps are just waiting to be put to work, there's the other end of the wires.

Much credit goes to this crew and especially Phil who designed the whole thing, procured the conduit and wire, and organized and supervised the team that saw it through. The wire was laid in the best spirit of the Friends of the Mojave Road and the Mojave Desert Heritage & Cultural Association at no cost to the MDHCA except possibly for the materials.

The job is done. That's the bottom line. There'll be no holdup now. The subcontractor in charge of electricals can step right up and finish the job and electrify the building at the appropriate time in the construction cycle.

Three cheers for Phil Motz and his wire pullers!

Wednesday, January 16, 2008

Electrical conduit trench completed to Library

Report and photos by Dennis Casebier

This has been quite a day. The weather was bitter cold all day with a strong wind out of the northeast. Everyone out there was bundled up and still had to brave the cold.

Messrs. Cordova & Co. started work on time, but they knocked off at about noon as it was considered unsafe to work on the rafters in the wind and cold.

In spite of the weather, Gail Andress showed up on time and spent much of the day digging the trench for the electrical conduit that will carry power to the new Library/Depot. Phil Motz was out there directing the effort with Bob Beal and Morris Swain assisting.

The ditch was dug, the conduit laid, and the ditch covered back up. It is planned that Phil, assisted by Gus Lind, will be stringing the wire through the conduit tomorrow.

Meanwhile, this morning a delivery truck brought more materials, including the corrugated siding for the sides of the Freight House, lumber for trim, and other supplies.

Two San Bernardino County building inspectors were at the construction site early this morning for the "nail/shear" inspection. They checked the construction over carefully and we passed with flying colors.

This project is moving forward rapidly and appearances are it'll continue that way.

Monday, December 17, 2007

Slab poured and lumber delivered

Report and photos by Dennis Casebier

Today was a very busy day for the Goffs Cultural Center with all activities centering around construction of the new Library/Depot.

Craig Merriam's concrete crew came on to the property at 6:00 AM. The four concrete trucks from Mohave Valley began arriving a little before 7:00 AM, staggered at about fifteen minute intervals. This was in addition to the three trucks that poured the footings Friday.

The five men comprising the concrete crew worked frantically handling that amount of mud. But in not much more than a hour and a half the footprint of the slab was filled in and the four trucks had come and gone.

The crew spent much of the rest of the day finishing it off. The result is a really fine-looking slab upon which the Library/Depot will be based.

At mid-afternoon, a huge lumber delivery truck arrived with a heavy load from Palm Springs. The contractors had all left. They had indicated to us where they'd like the lumber placed, so it fell to the Goffs crew to direct the placement of the lumber and assist the driver in the actual unloading.

That required nearly three hours - it was getting dark and a cold breeze had come up before that work was done.

So now there's a massive assortment of lumber out there ready to be made into a building and we understand the contractor will be back tomorrow morning and begin nailing boards together! This is pretty exciting stuff for us MDHCA members at Goffs.

For our part, the following people were present and helping out as they could throughout the day: Gus and Stella Lind, Ron Shepard, John Harrington, Hugh & Carol Brown, Morris & Judy Swain, Jan Sears, Jerry Sears, and Dennis & Jo Ann Casebier.