Showing posts with label Hugh Brown. Show all posts
Showing posts with label Hugh Brown. Show all posts

Thursday, October 9, 2014

Stamp mills highlight museum celebration

Hugh Brown, left, current director of the Mojave Desert Heritage and Cultural Association, stands with former director Dennis Casebier on the upper level of the association's recently renovated stamp mill. (MARK MUCKENFUSS, STAFF THE PRESS-ENTERPRISE)

BY MARK MUCKENFUSS
Press-Enterprise


Dennis Casebier has learned that you don’t have to build it to get them to come; you just have to have the materials on hand.

Casebier, a desert historian and former head of the Mojave Desert Heritage and Cultural Association, found himself standing in a salvage yard in the high desert town of Rosamond in 1996, looking at pieces of a large, ore-crushing machine. He had a vision of reconstructing the monstrous piece of equipment on the grounds of the association’s museum in Goffs, about 30 miles northwest of Needles.

Originally, the material was headed for Disneyland, which had been collecting antique Western props for its parks in the 1980s, Casebier said. The Rosamond dealer “got one 10-stamp mill too many,” he said.
Casebier bought the mill and some other material for $15,000. It took a year to haul everything back to Goffs. And there it sat for 14 years.

This Sunday, visitors to the Goffs museum will not only be able to see the 20-foot-high, 15-foot-wide reconstructed American Boy 10-stamp mill but also will get to watch it run. Casebier said it is the only operational 10-stamp mill in California that he knows of. The nearest is in Arizona.

The same man put both machines together.

Casebier said Charlie Connell came looking for him, which was a good thing. Otherwise, the mill, which weighs more than 30 tons, probably still would be sitting in pieces.

“I had no idea where to start,” said Casebier, a physicist who worked for three decades on weapons systems at the Naval Surface Warfare Center in Norco. “We’ve learned patience out here. Sooner or later, somebody will come along who’s interested.”

Connell, of Phoenix, heard through the grapevine that Goffs had a stamp mill.

“He’s a nut about stamp mills,” Casebier said. “He has a little team of guys (including his wife, Kathy) and they just love working on stamp mills. He lets them know he’s coming out and somehow they show up from as far away as Colorado.”

It took Connell and his crew three years of work – an estimated 4,100 man hours – to put the mill back together using original and newly made parts. They turned on the machine for the first time in March, using a diesel motor. Originally, the mill would have been powered by a steam engine.

It is the sixth mill that Connell, a retired nuclear plant worker, has constructed. He also helped get the Goffs museum’s smaller two-stamp mill operating.

An amateur gold prospector, he was volunteering at the Arizona Mining and Mineral Museum when he learned about an abandoned stamp mill in the desert. He didn’t know what a stamp mill was at the time, but when he saw the dilapidated remains, it got the better of his tinkering nature – he’d rebuilt a Model A in earlier years – and he decided he had to put the stamp mill back together.

“I like to see things run,” Connell said.

It has become an avocation. Besides the ones he has rebuilt in Arizona and California, Connell said he has consulted on stamp mill reconstructions as far away as Colorado. Last summer, he spent two weeks on a road trip that took him through several Western states looking for stamp mill parts. He even traveled to Australia and New Zealand to look at stamp mills there.

Thanks to Connell and his crew, both stamp mills will be operating Sunday. And although the machines may draw the most attention, Casebier hopes visitors also will check out the rest of the museum he spent more than 20 years putting together.

The project started in 1990, when he and his wife bought the Goffs Schoolhouse and restored it to its original condition. The school is now on the National Register of Historic Places. Sunday’s event is a celebration of the schoolhouse’s 100th anniversary.

The Casebier’s and some museum staff are pretty much Goffs only residents these days. At its peak in the 1920s, 200-300 people lived in the town. Route 66, local mining and the railroad kept it alive for many years.

In addition to the schoolhouse, the museum also has an archival library on historical materials related to the Mojave Desert.

Casebier – a transplanted Kansan, fell in love with the desert during a two-year stint in Twentynine Palms when he was in the Marines. He started exploring and researching the Mojave Desert not long after he started his civilian job with the Navy, then in Corona, in 1960.

His work often took him to Washington, D.C.

“I’d spend my evenings in the National Archives,” he said, delving into desert history. “I did that for 30 years.”

The Goff’s museum has a 10,000-volume library, a collection of more than 100,000 photographs and 6,000 maps. But what Casebier values most is the material from his oral history project. The archive holds recordings from interviews with 1,300 people. Casebier did most of the interviews himself.

“If there was only one thing we could get on the ark, that would be it,” he said. “That is a national treasure.”

Much of the archive is housed in the recently completed Goffs Depot, a reconstruction of the original train station that sat just a short distance away. Tours of the building will be part of Sunday’s activities, along with games for kids, a book sale and lunch for visitors. In addition, there are the museum’s wide array of historical objects and equipment, many related to the local mining industry.

Casebier is hoping a few of those visitors might consider becoming volunteers for the museum site and fall in love with the place the way he did.

“I wanted to go to the desert and I like doing things with things that are neglected,” Casebier said. “This whole place here is a testament to that.”

Monday, September 8, 2008

O. A. Russell Collection delivered to Library

Report and photo by Dennis Casebier

The O. A. Russell Collection was delivered to Goffs from Tucson, AZ today by Chales A. Corder and his daughter Christine. Actually they arrived yesterday evening and were our house guests until about noon today.

Carol and Hugh were on hand to assist Jo Ann and I and the Corders in unloading. The collection is on flattened cardboards on the floor in the first floor of the Depot, except for a particular collection of negatives that are considered to be especially critical. Those have been removed to a file cabinet in the Court House.

Since we now have a collection of value in the Library/Depot, Hugh said he would activate the security system. We are scheduled to receive 48 file cabinets on Wednesday of this week. After they come we plan to relocate the Russell Collection into several of those cabinets for temporary storage and protection.

Saturday, August 30, 2008

Tables delivered for the new Library

Report by Dennis Casebier

Rob Fulton was here today deliverying three tables for the Library/Depot. Rob, Mark Wire, and Hugh Brown unloaded them. They are in the south Freight House. Some assembly required.

Saturday, August 2, 2008

Water tanks painted and signs delivered

Report by Dennis Casebier
Photo and artwork by Chris Ervin


Hugh Brown and Mark Wire commenced painting the two 5,000-gallon water tanks that support the Library/Depot. This project continued for several days.


Also, Steve and Mary Mongrain were here to deliver the GOFFS and SANTA FE SIGNS for the Library/Depot. The signs are being donated by their business, Vegas Valley Business Forms.

Thursday, July 31, 2008

Intrusion alert system completed

Report and photo by Chris Ervin

Yesterday, Dave Mongrain of Alert Team, completed hooking up power to the security alarm and intrusion alert system. Director Hugh Brown provided Dave with support and received some training on the system.

There are still a couple of items remaining to do on the system; 1) "punch down" the auto dialer phone wires on the phone block once it is installed on the backboard, and 2) program the auto dialer with desired phone numbers to call should the alarm be tripped.

Dave intends to complete these items when he comes out to the Rendezvous in October.

Sunday, July 6, 2008

Ditch dug for the phone lines

Report and photos by Dennis Casebier

Much hard work has been accomplished over the past few days in getting the phone lines to the new building. It wasn't until mid-week that we were able to settle with Dan Cordova on a point to bring the phone lines into the building.

In order to accomplish it we had to dig a ditch a little over 200 feet long to carry the line from the Power House to the northwest side of the building where the line will enter. But the job is done and Phil will now be able to get the phones through into the building before he leaves on the 17th.

I say the job is done but it isn't exactly. We still have to string the line from the Power House to the power pole near Lanfair Road. Phil and I can do that.

This important and difficult work has been accomplished over a holiday weekend in intense heat - by Phil Motz, Hugh Brown, and myself. It was very hot working out there on that ditch!

Wednesday, March 12, 2008

Tanks, a lot

Report and photos by Dennis Casebier

We are experiencing beautiful weather. Our high temperature today was over 80 degrees with only a breeze. Things have been pretty quiet around the construction site for the past several days, until today.

Rudy of C & R Tanks of Tulare, CA arrived at about 10:00 AM with our truck load of tanks. We led him in through the service entrance and up to the job site. He nosed his big rig out towards the Stotts Stamp Mill gate and then backed in along side the pad constructed by Gail Andress where the two 5,000 gallon tanks are to go.


The straps were removed from the three round tanks, they were rolled off, shifted into position, and set down. The whole process took no more than 30 minutes. We positioned the big tanks so their fill holes and drains line up with about six feet between them. This will facilitate getting them all hooked up to the water system.


For the fourth tank, the 1,000 gallon septic tank, a different procedure was used. Gus and Morris put straps around the tank then lifted it off the truck with the Greening Tractor. The tank was then moved over near the spot where it is to be buried.


The total delivery was of two 5,000 gallon water tanks for fire fighting purposes, one 2,500 gallon tank for potable water, and one 1,000 gallon sepic tank.

Saturday, February 9, 2008

Board members tour Library construction

Photos and captioning by Chris Ervin

One of the items of business on today's MDHCA Board meeting agenda was for the members to tour the new Mojave Desert Archives Library construction site.

From left to right; MDHCA Directors Hugh Brown, Jo Ann Casebier, Dennis Casebier, John Terrill, and Steve Mongrain enjoy a moment in the sun.

The two large rooms of the Freight House will serve as the stacks for the Library.

View from the reading room looking out east through the bay windows.

It's easy to see the two-story Depot from quite a distance in any direction.

Board members inspect the corrugated metal siding on the south end of the Freight Building. Much satisfaction with the progress and quality of work was expressed by all directors.

Saturday, January 19, 2008

Electrical wiring has been pulled

Report and photos by Dennis Casebier

Sacrifices in the face of adversity are becoming commonplace around here.

By the terms of our agreement for construction of the Library/Depot, we are required to run an adequate power line up into the new structure. After that, General Contractor Cordova is responsible for electrifying the building.

As those of you who are following this project know, we arranged with Southern California Edison for a 400 amp service for the new building. This was accomplished last year through a major effort on the part of our own director-electrician Phil Motz and the assistance of several other volunteers. The 400 amp service was brought in and is at the ready in a new Power House that was constructed by our volunteers.

The immediate remaining challenge was to get that power conveyed underground from the Power House some 200+ feet to the Library/Depot building. This past week Gail Andress came over from Nelson, Nevada and used our backhoe to dig a ditch for the required 2" conduit line. Phil Motz and others laid the conduit and then the ditch was covered.

The final task was to get three strands of "000" power line and a smaller ground line through the conduit. Phil laid his plans carefully for this but got skunked by the severe weather Thursday and Friday of this past week. It was just too cold and windy. Not only that, but we are up against a time schedule because Phil is poised to return to Indiana this coming week.

So, taking advantage of a bit of softening in the temperature and wind, Phil and his crew tackled the job today. In addition to Phil, his team consisted of; Gus Lind, Morris Swain, Dorothy Beal, Bob Beal, and Hugh Brown. Working aginst difficult odds and adverse weather the job was accomplished today.

If you go out there to the new Library/Depot building, you'll see the wires coming out into the building right where they are supposed to be. Then, walk a couple of hundred feet to the Power House, where the 400 amps are just waiting to be put to work, there's the other end of the wires.

Much credit goes to this crew and especially Phil who designed the whole thing, procured the conduit and wire, and organized and supervised the team that saw it through. The wire was laid in the best spirit of the Friends of the Mojave Road and the Mojave Desert Heritage & Cultural Association at no cost to the MDHCA except possibly for the materials.

The job is done. That's the bottom line. There'll be no holdup now. The subcontractor in charge of electricals can step right up and finish the job and electrify the building at the appropriate time in the construction cycle.

Three cheers for Phil Motz and his wire pullers!

Tuesday, January 15, 2008

Colors picked for the exterior

Report and photos by Dennis Casebier

Today was nice weather-wise and a productive day for Cordova & Co. The arrival of the Genie "lift" gave everyone a boost. It made for lots of good photos, too.

A highlight of the day was selection of colors for the exterior of the building. A committee consisting of Carol and Hugh Brown, Phil Motz, Dennis and Jo Ann Casebier, and anyone that happened to be standing around, made the selections.

The colors selected were picked to represent the old Santa Fe yellow with green trim. The final selections are YUMA GOLD and LUCKY CLOVER GREEN.
Mr. Cordova ordered the paint today. He'll be painting some portions of the building as early as next week.

Tomorrow, master backhoe operator Gail Andress, direct from Nelson, Nevada, will be digging the trench for the electrical conduit that will carry power from the new Power House to the Library Depot. This will be done under the direct supervision of head electrician Phil Motz with Dennis Casebier providing overall supervision and foreign policy.

Monday, December 17, 2007

Slab poured and lumber delivered

Report and photos by Dennis Casebier

Today was a very busy day for the Goffs Cultural Center with all activities centering around construction of the new Library/Depot.

Craig Merriam's concrete crew came on to the property at 6:00 AM. The four concrete trucks from Mohave Valley began arriving a little before 7:00 AM, staggered at about fifteen minute intervals. This was in addition to the three trucks that poured the footings Friday.

The five men comprising the concrete crew worked frantically handling that amount of mud. But in not much more than a hour and a half the footprint of the slab was filled in and the four trucks had come and gone.

The crew spent much of the rest of the day finishing it off. The result is a really fine-looking slab upon which the Library/Depot will be based.

At mid-afternoon, a huge lumber delivery truck arrived with a heavy load from Palm Springs. The contractors had all left. They had indicated to us where they'd like the lumber placed, so it fell to the Goffs crew to direct the placement of the lumber and assist the driver in the actual unloading.

That required nearly three hours - it was getting dark and a cold breeze had come up before that work was done.

So now there's a massive assortment of lumber out there ready to be made into a building and we understand the contractor will be back tomorrow morning and begin nailing boards together! This is pretty exciting stuff for us MDHCA members at Goffs.

For our part, the following people were present and helping out as they could throughout the day: Gus and Stella Lind, Ron Shepard, John Harrington, Hugh & Carol Brown, Morris & Judy Swain, Jan Sears, Jerry Sears, and Dennis & Jo Ann Casebier.

Thursday, November 29, 2007

Construction contract signed

Report by Hugh Brown

On behalf of the Association, Director Hugh Brown traveled to Yucca Valley today and signed a contract with General Contractor Dan Cordova to construct the Mojave Desert Archives Library building.

Dan says the grader is in Goffs today to do the necessary watering and will begin work on the pad next week. He also says the concrete crew is lined up right behind the grader.