Flooring delivery and plumbing leak

Report by Dennis Casebier

The flooring guys, led by Jim O'Connor, were here before noon. They dropped off a bunch of flooring (apparently not all of it) and then departed for Laughlin. They said they'd be back Wednesday morning with the rest of the flooring to do the job.

The plumber came in some time this morning. He found a leak. It was in a pipe that got punched with a nail during some of the finish work around the toilet. It's now been fixed. The plumber adjusted the pressure in the pump house to 56 pounds.

Very hot in Goffs today. 110 degrees at 3:30 PM on the west porch.