Report by Dennis Casebier
Dave Mongrain of Alarm Team arrived yesterday and began installing the wire necessary for the security system for the interior of the Library/Depot. He spent the night and finished up that part of the installation by early this afternoon. He'll be back when the drywall is in place to install the security system hardware.
Saturday, March 29, 2008
Thursday, March 27, 2008
Ready to go
Report by Dennis CasebierPhotos by Dennis Casebier and Roger Mitchell
Today, the "A" Team, consisting of Phil Motz (in charge), Gail Andress, Gus & Stella Lind, and Morris Swain assembled on the west side of the Library/Depot with all the materials in hand to install the septic system that will support the new facility.
At the controls of the Jack & June Greening Tractor, Gail Andress did the digging, with shovel accompaniment provided by the Linds and Morris Swain.
With the big hole dug, Gail lowered the new 1,000 gallon septic tank into the hole.
Meanwhile, the crew had the sewer line ready to connect from the building.Gail then dug the ditch for the 50-foot leach line and dumped the required amount of leach rock in the bottom. The leach line was laid on the rock and more rock placed on top of that -- according to code.
The job will be finished tomorrow by laying newspaper on top of the rock on top of the leach line. Then the whole thing will be covered with dirt.While the leach line was being laid the new septic tank was filled with water. Next thing you know, we'll be almost "ready to go," so to speak.
Wednesday, March 12, 2008
Tanks, a lot
We are experiencing beautiful weather. Our high temperature today was over 80 degrees with only a breeze. Things have been pretty quiet around the construction site for the past several days, until today.
Rudy of C & R Tanks of Tulare, CA arrived at about 10:00 AM with our truck load of tanks. We led him in through the service entrance and up to the job site. He nosed his big rig out towards the Stotts Stamp Mill gate and then backed in along side the pad constructed by Gail Andress where the two 5,000 gallon tanks are to go.
The straps were removed from the three round tanks, they were rolled off, shifted into position, and set down. The whole process took no more than 30 minutes. We positioned the big tanks so their fill holes and drains line up with about six feet between them. This will facilitate getting them all hooked up to the water system.
For the fourth tank, the 1,000 gallon septic tank, a different procedure was used. Gus and Morris put straps around the tank then lifted it off the truck with the Greening Tractor. The tank was then moved over near the spot where it is to be buried.
The total delivery was of two 5,000 gallon water tanks for fire fighting purposes, one 2,500 gallon tank for potable water, and one 1,000 gallon sepic tank.
Thursday, March 6, 2008
The roof is complete
Report and photo by Dennis CasebierThe wind came back before dawn this morning. The temperature on front porch at 6:15 AM was a hair below 40 degrees. It must have gotten a little colder during the night because we had a thin sheet of ice on the bird water.
The roofers came back a little before 10:00 AM and they a re out there in the cold wind now on the tall ladders trying to get roofing on the top of the depot. That roof is steeper than the roof on the Freight House.
And now, here in the early afternoon, the roofing is on the second story of the Depot. The wind is still blowing and it's cool out even though it's bright and sunny. The roofers are still working on the details, but basically, the roof is on and completed.
Wednesday, March 5, 2008
Combo inspection
Report by Dennis Casebier
The temperature on the front porch was about 40 degrees at 6:15 AM. That's the good news. The bad news is that it was blowing a gale out there again. We had a one-day respite, yesterday.
The inspectors - Steve Given and Gary Given - showed up earlier than expected. John Harrington and I went out and stayed with them in the cold wind for the better part of two hours. Fortunately Dan Cordova, who fully intended to be here while the inspectors were here, showed up after the first hour or so. They did a pretty thorough inspection and found a few things that needed attention. In the end they signed off on the "combo" inspection. The next step will be insulation and then onward to drywall.
This was Gary Given's last inspection visit to our site due to his impending retirement. We reflected over the development that has taken place here over the past 18 years and he expressed himself proud of what has been accomplished.
In the midst of the inspection, the roofers arrived (to my amazement considering the wind storm), and began to work.
I didn't get to go off on my "morning" walk until about 5:00 PM this afternoon. By the time I got northward up to where I normally stop, the wind had quit. I did an about face and headed back down the hill. As I approached the fence line I thought sure I heard the sound of a nail gun. So I cut through the creosote bushes down to the construction site. By the time I got there it was nearly dark.
Sure enough, the roofers were up there putting the finishing touches on the east roof of the Freight House. I stopped and visited with them a bit and then came on home. It is heartening to see Americans working hard. And they are doing a good job, too. There are so many these days that want everything for nothing. They said they'll be back tomorrow to finish the roof over the depot. They wanted to know if I liked the way it looked. Of course we do. They, like every other one of the subcontractors hired by Dan Cordova have done excellent work.
The temperature on the front porch was about 40 degrees at 6:15 AM. That's the good news. The bad news is that it was blowing a gale out there again. We had a one-day respite, yesterday.
The inspectors - Steve Given and Gary Given - showed up earlier than expected. John Harrington and I went out and stayed with them in the cold wind for the better part of two hours. Fortunately Dan Cordova, who fully intended to be here while the inspectors were here, showed up after the first hour or so. They did a pretty thorough inspection and found a few things that needed attention. In the end they signed off on the "combo" inspection. The next step will be insulation and then onward to drywall.
This was Gary Given's last inspection visit to our site due to his impending retirement. We reflected over the development that has taken place here over the past 18 years and he expressed himself proud of what has been accomplished.
In the midst of the inspection, the roofers arrived (to my amazement considering the wind storm), and began to work.
I didn't get to go off on my "morning" walk until about 5:00 PM this afternoon. By the time I got northward up to where I normally stop, the wind had quit. I did an about face and headed back down the hill. As I approached the fence line I thought sure I heard the sound of a nail gun. So I cut through the creosote bushes down to the construction site. By the time I got there it was nearly dark.
Sure enough, the roofers were up there putting the finishing touches on the east roof of the Freight House. I stopped and visited with them a bit and then came on home. It is heartening to see Americans working hard. And they are doing a good job, too. There are so many these days that want everything for nothing. They said they'll be back tomorrow to finish the roof over the depot. They wanted to know if I liked the way it looked. Of course we do. They, like every other one of the subcontractors hired by Dan Cordova have done excellent work.
Tuesday, March 4, 2008
Roofers on a catwalk
It has been a nice, but busy day. The low was just below freezing overnight, enough to put a little ice on the bird water. But generally speaking the weather was nice all day.
The roofers showed up at about 10:00 AM. They come late and work late. For example, here it is 5:30 PM and I can look out my window across the street and they are still there. They are working on the high roof over the two story Depot. They don't have a lift so they are using ladders. It gives me the willies just to watch them. But they are getting the roof covered.
Tomorrow we are scheduled for what is called a "combo" inspection by the Department of Building and Safety of San Bernardino County. This includes an inspection of the electrical and a bunch of other stuff all at the same time. So, in the life of a construction project, this is exciting stuff.
Also the telecom guy is going to be here in the neighborhood on other business tomorrow, so we'll be chatting with him about phone lines for the new building.
John Harrington arrived back from his extended trip to Michigan and Florida. He'll be here until about the 17th of March when he plans to leave indefinitely. Hopefully he'll come back someday. It has been a joy to have him here. And he did a lot of good work. Highlights in his accomplishments are painting almost all the buildings and the construction of the Library/Depot model that so many have enjoyed seeing in the Schoolhouse and the top of this page.
Monday, March 3, 2008
West side Freight House roofing finished
Report and photo by Dennis CasebierThe wind blew all night and was blowing some when we got up this morning, but it wasn't real cold at 39 degrees on the front porch. I figured not much work would get done, but then along about mid-morning, things began to happen.
First the roofers showed up. Three guys altogether. Then the wind slacked off. They've been working steadily out there ever since. It appears they'll get the roof on the west side of the Freight House done today. They are hopeful of finishing the whole roofing job by Wednesday. They have not started on the roof over the two-story part. But Mr. Cordova told me they plan to have a different crew out here tomorrow to do that portion and likely they'll finish it tomorrow.
I went over to the job site again at 3:00 PM and saw the roofers had finished the roofing on the west side of the Freight House. They were up on the tall ladders working on the west edge of the roof over the two-story part. I expect they are serious about getting that done tomorrow. The roof on the east side of the Freight House isn't completed yet, but it will be easy compared to the roof over the two-story part.
Friday, February 29, 2008
Warm leap day

Report by Dennis Casebier
Beautiful day today. The temperature hit 85 degrees on our front porch. There was very litle breeze.
The roofers showed up at 11:00 AM and tend to work late. Likely it is that they don't want to start laying shingles until it warms up and then they like to keep going. A little less than half the roofing is laid on the east side of the Freight House and they have begun to work on the west side. No work yet on the roof over the second story of the Depot.
The electricians did not come back today. We are well into the time for each of the "trades" to do their job.
Wednesday, February 27, 2008
Roofers arrive!

Report by Dennis Casebier
It was a beautiful day all day today. The temperature was well over 80 degrees in the afternoon. I'm seeing ants beginning to clean out their nests, lizards scurrying around, and sparrows hurrying everywhere with nesting material.
The two electricians were here all day. They are nearly finished.
A man was here this afternoon to develop a bid to put in some security features on the new building.
Then late this afternoon, the roofing crew showed up under the direction of Fred Carrido of Alpine Roof Company. Gus and I went out to connect with him. Fred was determined to get started this afternoon.
He has brought some special material with him to put down on the roof to serve as an undercoat. It was late in the afternoon but they not only unloaded, but got up on the roof and started to work.
In fact, here at 5:30 PM they are still up on the roof working. They won't be able to work much more, but the days are getting longer. They are to come back tomorrow and Friday and plan to finish up next week.
Tuesday, February 26, 2008
Electrical wires strung
Report by Dennis CasebierPhoto by Chris Ervin
Fred Compton (Jr.), the electrician from C & S Electric has just finished stringing what he calls the "high voltage" wires, which is just ordinary stuff like plugs, switches, and outlets. He'll be doing the "low voltage" stuff tomorrow. That's the phone, data, and cable TV lines. He's coming right along and is expecting his father, Fred Compton (Sr.), to come along this evening with the low voltage supplies.
Steve Davis of Pacific Raingutters was here today. He looked things over and didn't see any problems. His plan is to go with aluminum gutters and down spouts. He'll bring a machine and sheet metal and manufacture what they need right on the spot. He left a color chart tacked to the wall in the north Freight House room. He plans to go with Forest Green which will more or less match the trim.
Monday, February 25, 2008
Second story blocks and chimney
Friday, February 22, 2008
Stairway to second floor built
Report by Dennis CasebierPhotos by Chris Ervin
There was a lot of rain in the East Mojave today. It rained off and on here in Goffs all day but it was not particularly heavy. Searchlight, on the other hand, experienced heavy rain more than once today and then heavy fog late in the day.
In spite of the bad weather much was accomplished on the Library/Depot project. General Contractor Dan Cordova and two of his crew showed up early in the morning and spent the day building the stairs to the second floor of the depot. For the first time there's a convenient way to reach that space. Before you had to use a ladder.
A crew consisting of Gail Andress, Gus and Stella Lind, and even myself through part of the day, laid a 2" water line all along the west side of the Library/Depot. That included digging the ditch (that's Gail's specialty using the backhoe), laying the pipe, and getting it glued together. Gail then covered the ditch and smoothed it out.
It was a long working day under adverse weather conditions, but the job is done. That finishes most of what we can do in the way of laying pipes now until the water tanks are delivered and put in place.MDHCA Director Russ Kaldenberg spent a good part of the day here today. He'd been following construction progress on this blog, but today was the first he'd actually seen it. He got here just in time to be able to access the second story of the Depot with the new stairs.
The electrician Fred Compton was here today. He brought a load of electrical supplies and is due back tomorrow.
It is cold and wet here in Goffs tonight.
Thursday, February 21, 2008
Outside painting finished
Report by Dennis CasebierPhotos by Chris Ervin
This was quite a day. As previously reported, the Case backhoe tractor was down due to the failure of a seal in a hydraulic piston. Gail Andress got up early this morning so as to be at the Case tractor parts place in Las Vegas when they opened at 6:00 AM. He bought the necessary part and then high-tailed it for Goffs.
Gail arrived here at 7:30 AM and then he, Gus and Stella Lind, and Morris Swain worked for four hours to get the piston repaired. And, lo and behold, it worked just fine! (Gail said he used to make repairs like this all the time, but he hadn't done one in 40 years!).
The crew was back out there right after lunch. They dug a trench along on the west side of the building adjacent to where the stairs will be, laid the water pipe, connected a pipe to the input to the new building, and got it all covered back up again. It was getting dark by the time the job was finished. It was necessary to get that stretch of pipe laid because Mr. Cordova plans to work at that spot tomorrow to build the stairs.
The plumber was here today running a line into the attic for humidifiers. He made other adjustments to the water system.The painters finished with outside painting today. They finished all the yellow and green.
Mr. Cordova thinks the roofers will come out soon to get the tar paper on the roof to make it water proof. He will call early tomorrow morning to get a weather check before sending the roofer out.
The weather today was pretty good. Not especially cold early-on, but by late afternoon there was a stiff breeze out of the west and it was colder.
Spirits are high at Goffs as this beautiful new building comes into focus. A lot of good work was done at Goffs by a lot of good people today.
Wednesday, February 20, 2008
Many highlights during a busy, full day
Report by Dennis CasebierIt was 42 degrees on our front porch at 6:30 AM with little or no breeze. By 11:00 AM it got up to 60 degrees with a pretty good little breeze out of the northeast.
The painters arrived just before 7:00 AM. The new building got a lot more yellow color yesterday. Much of today was spent touching up the green trim.
Building inspectors Gary Given and Steve Given were here this morning and toured the construction site.
Gail Andress and Gus Lind completed the pad for the 2,500 gallon potable water tanks today along with considerable work on our drainage system. That's the good news.
The bad news is that there was a failure in one of the hydraulic pistons that operates the backhoe on the tractor. Inasmuch as we were about to start on ditches for water lines, requiring the backhoe to be in constant and heavy use, that puts us in a bit of a bind.But you can't hold down Messrs. Andress and Lind. Gail went back home to Nelson this afternoon and got on the phone to the Case Tractor dealer and parts supplier in Las Vegas and made arrangements to pick up the needed part early in the morning before he comes over tomorrow. Once here, he and Gus plan to fix the piston and, assuming everything goes OK, we'll be back in business and can start digging the ditches for water lines.
As if that wasn't enough, beginning at about 2:30 PM we were hit by a squall, accompanied by lightning, thunder, and even some rain. It was severe enough that we turned off the breaker on the deep well pump and shut down the computers to avoid any damage from stray lightning.
That wasn't the last of the highlights for today. A break in the clouds permitted observation of the full moon rising in partial eclipse just as it was getting dark.
But now at 7:00 PM we're back about where we started this morning. Heavy overcast, very little wind, and about 43 degrees on our front porch. The full moon has disappeared behind the clouds.
Tuesday, February 19, 2008
Painting and padding
The painters showed up at 7:00 AM this morning. The weather was nice and continued nice all day. The temperatures got up to 70 degrees with little or no wind.
There are two painters: Brandon Bates and Rich Hernandez. As with everyone that has come out to work on our project, they are really nice guys and very competent. They painters worked through the day until 5:30 and got a lot done.
There's a lot more yellow on our beautiful new building than there was early this morning. They will be back early tomorrow and we can hope the good weather will continue.
Gail Andress arrived on site at 7:30 AM this morning. He manned the tractor and, assisted by Morris Swain and Gus Lind, worked all day to build the pad that will hold the two 5,000 gallon water tanks. It took all day.
We're going great guns at Goffs!
Monday, February 18, 2008
Painters arrive
Report by Dennis Casebier
It was about 35 degrees on the front porch at 6:30 AM. There's a bit of a breeze this morning.
As I come back south on and along Lanfair Road I always angle over and walk through the construction site. I was surprised to find the painters there getting ready for several days of painting.
The guy in charge is Brandon and his work force is Rich. Nice guys. As a convenience to us ditch diggers and backhoe operators, they are going to do the west side fist since we have a tentative plan of laying a 2" water line along there tomorrow in a ditch to be excavated by Gail Andress.
As I understand it the weather should be clear through sometime Wednesday or Thursday when some kind of system might come in. Hopefully they'll get the painting finished.
This morning Gus and Morris are busy moving scrap lumber away from the construction site out to the lumber yard so it won't be in our way when we are digging tomorrow.
It was about 35 degrees on the front porch at 6:30 AM. There's a bit of a breeze this morning.
As I come back south on and along Lanfair Road I always angle over and walk through the construction site. I was surprised to find the painters there getting ready for several days of painting.
The guy in charge is Brandon and his work force is Rich. Nice guys. As a convenience to us ditch diggers and backhoe operators, they are going to do the west side fist since we have a tentative plan of laying a 2" water line along there tomorrow in a ditch to be excavated by Gail Andress.
As I understand it the weather should be clear through sometime Wednesday or Thursday when some kind of system might come in. Hopefully they'll get the painting finished.
This morning Gus and Morris are busy moving scrap lumber away from the construction site out to the lumber yard so it won't be in our way when we are digging tomorrow.
Saturday, February 16, 2008
Picking up the wood scraps
Report by Dennis Casebier
Well, the Cordova crew is gone. And guess what? We're having the most beautiful day we've had in a long time. It got up to about 70 today and no wind! Now isn't that the way it is. Those poor guys have been struggling out there against the wind for weeks. Then they leave and the next day is like spring!
Gus and Morris have begun moving the lumber scraps. We are laying claim to them to use for firewood in the schoolhouse. So they are using the big bucket on the tractor to load the lumber scraps and take them to the lumber yard on the 5th segment. They'll have to dry out a bit before they will make good firewood. But there's a lot of scraps so we've got something of a windfall there.
Otherwise, nothing to report on the Library/Depot construction project today.
Well, the Cordova crew is gone. And guess what? We're having the most beautiful day we've had in a long time. It got up to about 70 today and no wind! Now isn't that the way it is. Those poor guys have been struggling out there against the wind for weeks. Then they leave and the next day is like spring!
Gus and Morris have begun moving the lumber scraps. We are laying claim to them to use for firewood in the schoolhouse. So they are using the big bucket on the tractor to load the lumber scraps and take them to the lumber yard on the 5th segment. They'll have to dry out a bit before they will make good firewood. But there's a lot of scraps so we've got something of a windfall there.
Otherwise, nothing to report on the Library/Depot construction project today.
Friday, February 15, 2008
Roofing materials delivered
It was 37 degrees on the front porch at 6:30 AM with a VERY strong wind out of the northeast, likely in the 40 MPH range. Right now it is about as bad as I've seen.
I stopped at the job site and talked with Dan. He and his crew are finishing up boxing in under the eaves. I expect they'll be gone mid-afternoon. Then the whole crew won't be back next week. They are mostly done with the outside. It doesn't appear that the stairs will get done today.
Dan said someone will be here next week to finish painting on the underside of the eaves and and touchup around the windows and elsewhere. Electrician Fred Compton is scheduled to be here on the 25th. Dan says after that will be the "combo" inspection. That's a big one.
The roofing just arrived! The delivery vehicle has a conveyer belt thing so the material can be positioned on the roofline of the Freight House. Nothing will be done with it today because the roofers aren't here and it's too windy. Dan is hopeful the roofers will come next week.
Thursday, February 14, 2008
Framing nearing completion
Report by Dennis Casebier
Gail Andress was scheduled to come over this morning from Nelson, Nevada. He made it OK. He, Gus Lind, and I assembled out by the new well and redesigned how we were going to position the two 5,000 gallon tanks and the associated pipes. At that point we agreed to abandon the digging project for the day because of the weather.
Cold strong winds were blowing out of the northeast. When I went out on our front porch at 6:30 AM this morning it was 42 degrees. By 9:00 AM, instead of warming up the temperature had fallen to 39 degrees and it subsequently went lower. So we called a "stand down" until next week. That should work out better anyway because we might have gotten in General Contractor Cordova's way today, and he and his crew will be gone next week.
Dan says he and his crew will be through up through the "combo" inspection) by tomorrow afternoon. After that it'll be up to the subcontractors. Dan will be out from time to time, but I believe his crew will be done with the framing job.
The electrician is presently scheduled to be here Monday, 25 February 2008.
Dan & Crew are working on the soffits covering the underside of the roof overhangs. In other words, the underside of the overhangs will be boxed in. That'll look a lot nicer and it'll permit the roofers to use longer nails on the shingles which will make them stay down better in the wind.
Dan hopes to get the stairs to the upper floor of the Depot completed by tomorrow.
At exactly 12:00 noon the temperature on the front porch has risen some but it is still blowing a gale.
Today is the 18th anniversary of our taking over the Goffs Schoolhouse property. What will the next 18 years bring?
Gail Andress was scheduled to come over this morning from Nelson, Nevada. He made it OK. He, Gus Lind, and I assembled out by the new well and redesigned how we were going to position the two 5,000 gallon tanks and the associated pipes. At that point we agreed to abandon the digging project for the day because of the weather.
Cold strong winds were blowing out of the northeast. When I went out on our front porch at 6:30 AM this morning it was 42 degrees. By 9:00 AM, instead of warming up the temperature had fallen to 39 degrees and it subsequently went lower. So we called a "stand down" until next week. That should work out better anyway because we might have gotten in General Contractor Cordova's way today, and he and his crew will be gone next week.
Dan says he and his crew will be through up through the "combo" inspection) by tomorrow afternoon. After that it'll be up to the subcontractors. Dan will be out from time to time, but I believe his crew will be done with the framing job.
The electrician is presently scheduled to be here Monday, 25 February 2008.
Dan & Crew are working on the soffits covering the underside of the roof overhangs. In other words, the underside of the overhangs will be boxed in. That'll look a lot nicer and it'll permit the roofers to use longer nails on the shingles which will make them stay down better in the wind.
Dan hopes to get the stairs to the upper floor of the Depot completed by tomorrow.
At exactly 12:00 noon the temperature on the front porch has risen some but it is still blowing a gale.
Today is the 18th anniversary of our taking over the Goffs Schoolhouse property. What will the next 18 years bring?
Monday, February 11, 2008
Ersatz chimney
Report and photo by Dennis CasebierIt was 44 degrees on the front porch this morning at 6:30 AM with a light breeze. It has been bright and sunny all day. At 1:50 PM it is 82 degrees on the front porch and continuing with a light balmy breeze.
General contractor Dan Cordova and crew showed up a little before 7:00 AM and they are out there "making hay while the sun shines." They are finishing the siding and also they have fabricated the ersatz or artificial chimney and it is being put in place.
Dan tells me he plans to have most of the framing work completed this week and then it'll be mostly up to "the trades;" meaning electrician, insulation, drywall, etc. Each of them will be in and out. In other words, we're getting down towards the end of the framing. The electrician may be here as early as next week.
All the wood scraps are being left for us for firewood and it is approaching time to gather all that kind of thing up and get it carried out to the lumber yard for aging. We could use help moving all this scrap lumber.
Saturday, February 9, 2008
Board members tour Library construction
Photos and captioning by Chris ErvinOne of the items of business on today's MDHCA Board meeting agenda was for the members to tour the new Mojave Desert Archives Library construction site.
From left to right; MDHCA Directors Hugh Brown, Jo Ann Casebier, Dennis Casebier, John Terrill, and Steve Mongrain enjoy a moment in the sun.
The two large rooms of the Freight House will serve as the stacks for the Library.
View from the reading room looking out east through the bay windows.
It's easy to see the two-story Depot from quite a distance in any direction.
Board members inspect the corrugated metal siding on the south end of the Freight Building. Much satisfaction with the progress and quality of work was expressed by all directors.
Wednesday, February 6, 2008
Finally, not much wind!
It turned out to be a beautiful day and the workers took full advantage of it. It was 25 degrees on our front porch at 6:15 AM. The Cordova crew showed up a little before 7:00 AM.
The builders got the corrugated siding installed on the west side of the Freight House, but not yet on the south end. The yellow lap siding all around the two-story Depot section looks to be mostly completed. Also they got the green paint on the fascia board all around the building today. They were staying later than usual today because of the improvement in the weather.
Dan said he needs to finish the siding and the roofing and after that it will be mostly various subcontractors installing insulation, electrical, drywall, etc. The electrical is a biggie. He said he had hopes the electrician will be here in about two weeks.
Tuesday, February 5, 2008
Corrugated metal siding installed
The Cordova team have continued to wrap the building, install lap siding, and install the corrugated metal siding on the east side of the Freight House. Also, most of the doors are installed.
On interior work, the crew has installed some ducting for air conditioning and heating in the ceiling of the first floor of the Depot.
Lance Cody of Hi-Desert Air and his crew of three or four showed up in the late afternoon and began laying out the air conditioning.
It has been tough working out there all day in the cold wind. Mostly sunny though. I'm hopeful they'll get a break in the weather soon.
They have two lifts on the site but they can't use the original one because it's less stable in the wind and could potentially blow over.
Monday, February 4, 2008
First CCHE reimbursement received
Report by Dennis Casebier
It was 32 degrees and clear at 6:30 AM and absolutely no wind. by 9:00 AM it was 44 degrees and the wind came back up. I believe the wind yesterday was the strongest we've had this season and it was right out of the northeast as it has a way of doing in the winter.
General Contractor Cordova and his crew arrived at right about 7:00 AM, coming today from Yucca Valley. They'll be staying in Laughlin through the week.
I met with Dan. Everything is on track. He said he'll be getting another lift tomorrow. He'll have this second lift for just one week. It is needed to focus the crew on finishing spray painting the eaves and installation of siding. There's no reason the siding can't proceed to completion.
Also Dan had a new roofing sample. Jo Ann and I took the camera over and shot a sequence of digital photos of the sample against the siding, roofing on the power house, and trim and have sent selections off to Chris to support his making the final selection on a shingle product.
A highlight of today was that we received the first reimbursement check from the California Cultural and Historical Endowment (CCHE) and the State of California demonstrating that the system actually works! Chris and Leslie Ervin get our great appreciation for administering the grant which culminates in the submission of invoices for reimbursement. We have another larger invoice pending and a third one will be sent in this week.
It was 32 degrees and clear at 6:30 AM and absolutely no wind. by 9:00 AM it was 44 degrees and the wind came back up. I believe the wind yesterday was the strongest we've had this season and it was right out of the northeast as it has a way of doing in the winter.
General Contractor Cordova and his crew arrived at right about 7:00 AM, coming today from Yucca Valley. They'll be staying in Laughlin through the week.
I met with Dan. Everything is on track. He said he'll be getting another lift tomorrow. He'll have this second lift for just one week. It is needed to focus the crew on finishing spray painting the eaves and installation of siding. There's no reason the siding can't proceed to completion.
Also Dan had a new roofing sample. Jo Ann and I took the camera over and shot a sequence of digital photos of the sample against the siding, roofing on the power house, and trim and have sent selections off to Chris to support his making the final selection on a shingle product.
A highlight of today was that we received the first reimbursement check from the California Cultural and Historical Endowment (CCHE) and the State of California demonstrating that the system actually works! Chris and Leslie Ervin get our great appreciation for administering the grant which culminates in the submission of invoices for reimbursement. We have another larger invoice pending and a third one will be sent in this week.
Friday, February 1, 2008
Doors are delivered
Report by Dennis Casebier
It turned out to be a very nice day for working on the Library/Depot. Sunny with moderate temperature, and no wind.
The doors for the new building were delivered this morning at about 8:30 AM and some were put up right away. Work continues on wrapping of the building and installation of siding.
Mr. Cordova said they'd be leaving about 1:00 PM today and sure enough they left at about 1:15 PM. He said they'll be back Monday.
It turned out to be a very nice day for working on the Library/Depot. Sunny with moderate temperature, and no wind.
The doors for the new building were delivered this morning at about 8:30 AM and some were put up right away. Work continues on wrapping of the building and installation of siding.
Mr. Cordova said they'd be leaving about 1:00 PM today and sure enough they left at about 1:15 PM. He said they'll be back Monday.