Wednesday, March 12, 2008

Tanks, a lot

Report and photos by Dennis Casebier

We are experiencing beautiful weather. Our high temperature today was over 80 degrees with only a breeze. Things have been pretty quiet around the construction site for the past several days, until today.

Rudy of C & R Tanks of Tulare, CA arrived at about 10:00 AM with our truck load of tanks. We led him in through the service entrance and up to the job site. He nosed his big rig out towards the Stotts Stamp Mill gate and then backed in along side the pad constructed by Gail Andress where the two 5,000 gallon tanks are to go.


The straps were removed from the three round tanks, they were rolled off, shifted into position, and set down. The whole process took no more than 30 minutes. We positioned the big tanks so their fill holes and drains line up with about six feet between them. This will facilitate getting them all hooked up to the water system.


For the fourth tank, the 1,000 gallon septic tank, a different procedure was used. Gus and Morris put straps around the tank then lifted it off the truck with the Greening Tractor. The tank was then moved over near the spot where it is to be buried.


The total delivery was of two 5,000 gallon water tanks for fire fighting purposes, one 2,500 gallon tank for potable water, and one 1,000 gallon sepic tank.

Wednesday, March 5, 2008

Combo inspection

Report by Dennis Casebier

The temperature on the front porch was about 40 degrees at 6:15 AM. That's the good news. The bad news is that it was blowing a gale out there again. We had a one-day respite, yesterday.

The inspectors - Steve Given and Gary Given - showed up earlier than expected. John Harrington and I went out and stayed with them in the cold wind for the better part of two hours. Fortunately Dan Cordova, who fully intended to be here while the inspectors were here, showed up after the first hour or so. They did a pretty thorough inspection and found a few things that needed attention. In the end they signed off on the "combo" inspection. The next step will be insulation and then onward to drywall.

This was Gary Given's last inspection visit to our site due to his impending retirement. We reflected over the development that has taken place here over the past 18 years and he expressed himself proud of what has been accomplished.

In the midst of the inspection, the roofers arrived (to my amazement considering the wind storm), and began to work.

I didn't get to go off on my "morning" walk until about 5:00 PM this afternoon. By the time I got northward up to where I normally stop, the wind had quit. I did an about face and headed back down the hill. As I approached the fence line I thought sure I heard the sound of a nail gun. So I cut through the creosote bushes down to the construction site. By the time I got there it was nearly dark.

Sure enough, the roofers were up there putting the finishing touches on the east roof of the Freight House. I stopped and visited with them a bit and then came on home. It is heartening to see Americans working hard. And they are doing a good job, too. There are so many these days that want everything for nothing. They said they'll be back tomorrow to finish the roof over the depot. They wanted to know if I liked the way it looked. Of course we do. They, like every other one of the subcontractors hired by Dan Cordova have done excellent work.

Tuesday, March 4, 2008

Roofers on a catwalk

Report and photo by Dennis Casebier

It has been a nice, but busy day. The low was just below freezing overnight, enough to put a little ice on the bird water. But generally speaking the weather was nice all day.

The roofers showed up at about 10:00 AM. They come late and work late. For example, here it is 5:30 PM and I can look out my window across the street and they are still there. They are working on the high roof over the two story Depot. They don't have a lift so they are using ladders. It gives me the willies just to watch them. But they are getting the roof covered.

Tomorrow we are scheduled for what is called a "combo" inspection by the Department of Building and Safety of San Bernardino County. This includes an inspection of the electrical and a bunch of other stuff all at the same time. So, in the life of a construction project, this is exciting stuff.

Also the telecom guy is going to be here in the neighborhood on other business tomorrow, so we'll be chatting with him about phone lines for the new building.

John Harrington arrived back from his extended trip to Michigan and Florida. He'll be here until about the 17th of March when he plans to leave indefinitely. Hopefully he'll come back someday. It has been a joy to have him here. And he did a lot of good work. Highlights in his accomplishments are painting almost all the buildings and the construction of the Library/Depot model that so many have enjoyed seeing in the Schoolhouse and the top of this page.

Monday, December 17, 2007

Slab poured and lumber delivered

Report and photos by Dennis Casebier

Today was a very busy day for the Goffs Cultural Center with all activities centering around construction of the new Library/Depot.

Craig Merriam's concrete crew came on to the property at 6:00 AM. The four concrete trucks from Mohave Valley began arriving a little before 7:00 AM, staggered at about fifteen minute intervals. This was in addition to the three trucks that poured the footings Friday.

The five men comprising the concrete crew worked frantically handling that amount of mud. But in not much more than a hour and a half the footprint of the slab was filled in and the four trucks had come and gone.

The crew spent much of the rest of the day finishing it off. The result is a really fine-looking slab upon which the Library/Depot will be based.

At mid-afternoon, a huge lumber delivery truck arrived with a heavy load from Palm Springs. The contractors had all left. They had indicated to us where they'd like the lumber placed, so it fell to the Goffs crew to direct the placement of the lumber and assist the driver in the actual unloading.

That required nearly three hours - it was getting dark and a cold breeze had come up before that work was done.

So now there's a massive assortment of lumber out there ready to be made into a building and we understand the contractor will be back tomorrow morning and begin nailing boards together! This is pretty exciting stuff for us MDHCA members at Goffs.

For our part, the following people were present and helping out as they could throughout the day: Gus and Stella Lind, Ron Shepard, John Harrington, Hugh & Carol Brown, Morris & Judy Swain, Jan Sears, Jerry Sears, and Dennis & Jo Ann Casebier.

Thursday, December 13, 2007

30 yards of concrete footings poured

Concrete is poured into the stem wall forms.

Report and photo by Dennis Casebier

Craig Merriam and his three-person concrete crew rolled onto the property at 6:45 AM this morning. Within fifteen minutes the first of three concrete trucks from Mohave Valley arrived. The other two trucks of "mud" showed up at 45 minute intervals.

Pretty soon Gus and Stella and I were out there, joined later by Jo Ann and John Harrington. So there were plenty of supervisors! These three loads were for the footings and it turned out three full loads was not quite enough. The shortage will be made up when the slab is poured.

Craig had hoped to pour the slab tomorrow (Friday) but the forecast is for 14 MPH winds early in the morning, building up to something closer to 20 MPH by the afternoon. Craig says that's too much so the slab will not be poured tomorrow. The next window of opportunity will be Monday.

It was cold this morning - right at 30 degrees. We had ice on the bird water for the first time this season. But there was very little breeze so it was not uncomfortable.

By 9:00 AM, the last of the three concrete trucks were cleaning out.

Around 1:00 PM, I noticed an extra white pickup at the work site. I found general contractor Dan Cordova there. He was pouring over the plans and had detailed questions about measurements and a few other items. I got John Harrington so we could all go over the details together. We had about an hour-long meeting over the details.

General contractor Dan Cordova is a carpenter by trade. His crew will be doing the framing. He had hoped to begin framing on Monday, but now that will have to be delayed. Dan says they'll start framing Tuesday and have the first story done by the end of the week. He said the lumber will arrive Monday and he showed me where he wants it placed.

Craig Merriam's crew is still out there working with the forms and concrete poured this morning.

I went to the pantry and fetched the notebook with all the photos we have of the Depot for show and tell. Everyone was very interested.

Wednesday, December 5, 2007

Trenching for the footings

Craig Merriam's concrete crew begins digging trenchs for the footings.

Report and photo by Dennis Casebier

Things are hopping at Goffs. The contractors began arriving from Twentynine Palms at 6:30 am.

Presently the graders (whose job is essentially done), concrete man, and trenchers, and General Contractor Dan Cordova are on the ground. Must be ten people out there. I've been out there continuously since 6:45 am. The weather doesn't get nicer.

With Chris on the phone so I could verify my logic, I approved the exact siting of the building. The building is now marked out on the ground and the trencher is going to dig for the footings.

The cement man is expecting a pretty thorough inspection a week from today. The way seems clear for a quick inspection. The concrete man, Craig Merriam, can begin to pour when and if they pass inspection next Wednesday. He plans to pour the entire thing before Christmas. It'll take two pouring days and will be dependent upon weather. Craig has three people here besides himself.

Electrical is being done by Fred of CWS electrical. A/C is in the hands of High Desert Air. The trenching man is Bruce Pendergrass.

New workampers, Jerry and Jan Sears, worked hard whapping burro bushes out west of the Library/Depot site. This effort is designed to expand the perimeter of our fire breaks around our beautiful new building.

By the end of the day, all of the trenching for footings was completed. John Marnell checked the trenches on the ground with John Harrington's model of the Depot and has certified they are correct. The weather is beautiful but I'm hearing there may be heavy weather moving in by this coming weekend.

Tuesday, July 10, 2007

Let There Be Light

Report by Dennis Casebier

Eureka! Southern California Edison came out and energized the 400-amp panel in our new Power House. That part of the job is done; the power is there for the new Library/Depot.


Many hands touched this project; it was genuinely a result of teamwork that pushed it over the goal line. Phil Motz provided the leadership and Ron Shepard and John Harrington were on hand at all times to provide assistance. Others helped.

Also, Phil Motz and Ron Shepard laid a 2" water line between the new Pump House and Power House.

Thursday, July 5, 2007

Electrical system for Library installed

Report by Dennis Casebier

Let me say with great admiration and appreciation that a crew under the supervision of Engineer Phil Motz, and consisting also of Ron Shepard and John Harrrington, has installed the heavy wiring that connects the new 400-amp power feed in the Power House to the Pump House that will power the new well.

It is hot, complicated, and heavy work and they have been out there in 100+ degree heat on several days in succession. As of this date, the job is completed and has been approved by the San Bernardino County Department of Building and Safety.

Engineer Motz has been given the highest grades for his work.

Sunday, April 22, 2007

Spring Encampment volunteer efforts

Report by Phil Motz

In anticipation of the Encampment, John Harrington had acquired the 4-inch, 2-inch, and 1-inch conduit for the electrical lines for the Power House and Pump House buildings. Robert Botich dropped off fluorescent fixtures for both buildings and a 100-amp panel for the Pump House.

The fire break west of the library site was established by a crew consisting of John Harrington, Red Brooke, Sharon Holmes, Larry Burkholder, Chris and Leslie Ervin, Kib and Shirley Roby, and Jackie Ridge.

Kib Roby manicured the new well site.

The conduit for the 400-amp incoming electrical service was put in place.

Saturday, April 7, 2007

New electrical service planned

Report by Dennis Casebier

Robert Botich, an electrician by trade, traveled from Corona to Goffs and met with Dennis Casebier, Phil Motz, and John Harrington to review Southern California Edison (SCE) electrical specifications and to plan out acquisition of 400-amp meter and circuit panel.

Saturday, March 17, 2007

Pump House materials run

From the Mojave Road Report

Dennis Casebier, John Harrington, and Ron Shepard pulled the Big Tex trailer to Bullhead City to procure lumber and other materials for the new Pump House. Construction was commenced today by Ron Shepard and John Reiff.

Wednesday, March 14, 2007

Pump House pour

From the Mojave Road Report

John Harrington, John Reiff, Ron Shepard, and Carl Weikel poured the concrete slab for the new Pump House and also a step at the new Power House.

Friday, March 2, 2007

Pump House preparation

From the Mojave Road Report

John Harrington commenced work on the foundation forms for the Pump House that will support the new well. John Reiff finished restoration fo the Slaughter cement mixer. Its first job will be to pour the Pump House foundation.

Wednesday, February 21, 2007

Power House construction begins

Report and photos by Dennis Casebier
Wednesday

We procured the materials for the 10' X 12' Power House yesterday. Today "The crew" went to work on getting the wall framing up and most of the wooden materials. From left to right; Bob Beal, Dorothy Beal, John Harrington, Ron Shepard, John Rieff.

They also painted the structure with an undercoat as protection against warping. Hope we have another nice day tomorrow!

Tuesday, February 20, 2007

Power House preparation

From the Mojave Road Report

A detachment consisting of Bob Beal, John Harrington, and Dennis Casebier, pulled the Big Tex trailer down to Home Depot in Bullhead City. They loaded it with almost all of the materials that will be needed for construction of what we've been calling the "Power House" that will serve the new Library/Depot building.

It measures 10' X 12' and will feature an old-time hip roof. That same day, Dorothy Beal, Bob Beal, and John Harrington commenced putting an undercoat of paint of the newly purchased boards to keep them from warping.

Saturday, December 30, 2006

Desert tortoise fence erected

From the Mojave Road Report

The following volunteers worked on erecting desert tortoise exclusion fence around building sites at the Goffs Cultural Center; Chris Ervin, Leslie Ervin, Don Johnson, Tom Smith, Harry Ridge, John Harrington, and Phil Motz,

Wednesday, October 4, 2006

New building designer plan review

Report by Dennis Casebier
Wednesday


Building Designer Paul Geissinger and wife Shari were here for three hours. After lunch John Harrington and I met in the Schoolhouse with Paul and went thoroughly through the draft of Library/Depot plans that Leggetts prepared and which Chris forwarded to us a few days ago.

Without going into specifications, the bottom line is that this isn't going to be difficult. Mr. Geissinger plans to have a revised form of the plans ready to discuss by Friday 13 October 2006. They will be reviewed by John Harrington and any Board members that want to join in.

There'll be a fee for certification by an engineer he works with. Also there'll be a fee for someone to do the heating and energy calculations.

Once the plans are completed, we'll have to take them to a truss manufacturer (one of the few things they have in Needles - I've done this before) and get truss calculations.

Then the plans go to the building inspector and he reviews and approves them and issues a permit.

John Harrington has decided to delay his trip to Michigan so he can participate in the plan review that will result in completion of the next draft by Friday 13 October 2006.

Tuesday, July 25, 2006

Well drilling contract signed

Report by Dennis Casebier
Tuesday


Chris Ervin gained CCHE approval to award the well drilling contract to Eagle Well Drilling and Pump Service of Newberry Springs. Into today's mail, along with a down payment and the contract signed by Dennis Casebier, went a map showing where the well is to be located.

Ray Ward of Eagle Drilling said he plans to get on our project about the middle of September. To meet a County Fire requirement, we're going to need water tanks for storing 10,000 gallons of water.

Thanks to John Harrington, Phil Motz, and Carl Weikel for the field work necessary to lay out where the well is to be located.

Saturday, July 15, 2006

Mojave Desert Archives Groundbreaking



GOFFS, CA – July 15, 2006 – At long last we broke ground for the new library archives building at the Goffs Cultural Center. The structure, funded in large part by the California Cultural and Historical Endowment, is to be built in the image of the old Goffs Railroad Depot.

A nice group of long-time supporters gathered in 110+ degree heat to witness the ceremony. A brief opening statement was made by Dennis G. Casebier, Executive Director MDHCA, who introduced Chris Ervin, president of the MDHCA. President Ervin stepped to the front, made carefully selected and poignant remarks, referred to our long-standing mission, what the new building will mean to humanity, and then proceeded to remove the first shovel of dirt.

For the ceremony, Mr. Ervin made use of a specially inscribed gold-plated ceremonial shovel provided by Director John Fickewirth. The shovel will be mounted on a wall in the Schoolhouse until the library is completed and then it will adorn a wall in the reading room of the new structure.

Following Chris Ervin’s lead, each director came forward and removed a shovel of dirt, accompanied by general approval of the assembled crowd. Following that, each other person present had an opportunity to participate in the ceremony.

By then everyone was getting warm… say, HOT. So we adjourned to the air-conditioned comfort of the Schoolhouse for follow-on speeches and to await the dinner hour. In the Schoolhouse Dennis Casebier passed out mementos in the form of miniature inscribed shovels, also provided by Mr. Fickewirth for the occasion.

Once everyone was there, President Ervin proposed a toast, followed by a couple more toasts from others. The champagne and champagne flutes were provided by Chris and Leslie Ervin. Then dinner was ready. Roast beef and special beans were prepared by Master Chef Dale McBride, potato salad and cole slaw were procured from a Bullhead City caterer, and other dishes were contributed by Betty Burton and Shirley Roby.

Once everyone had enjoyed the superb dinner we all indulged in dessert, a sheet cake appropriately decorated for the occasion and provided by Gail and Donna Andress. On the way over to Goffs from Nelson, Nevada, Gail had attempted to destroy the cake when it tried to slide off the seat and he grabbed for it, but Donna rose to the occasion and protected the cake. Meanwhile, Gail had gotten a handful of icing, which, at the urging of his bride of 62 summers, he proceeded to lick off his hand, turning his tongue and inside of his mouth (so far as could be seen) bright blue.

It was a smallish but very special group that gathered to take note of this important moment. I will confess, though, that I favor the celebrations that occur when something is finished more than marking the beginning. I am very much looking forward to that day a couple of years from now when the library building stands in all its splendor with the Board of Directors and our supporters gathered to honor that achievement.

Along those thought lines, my mind went back to that day in November of 1983 when a large group of the Friends of the Mojave Road gathered on the banks of the Rio Colorado of the West, just opposite Fort Mojave. There was an oversized yellow ribbon stretched across the road. A pair of ceremonial scissors (probably a full 30” long) had been provided, and Dennis Casebier stepped up and cut the ribbon, thereby signaling publication of the first Mojave Road Guide and the opening of the old wagon road as an interpreted four-wheel drive backcountry recreation trail. Twenty-three years have passed and the Mojave Road continues to serve and inspire the public. It was a day full of pride.

And so, within two years from now, we look forward to experiencing another of those milestone moments, of which it has been our honor to have had many, when Chris Ervin steps up to the door of the new library with an oversized pair of scissors and thereby dedicates and initiates operation of the Mojave Desert Archives to the interests of mankind. I predict many of you will be there and you will share the pride in having been part of this.

Those who participated in the groundbreaking ceremony included: Gail and Donna Andress, Jere Baker, Betty Burton, Chris and Leslie Ervin, Dave Given, John Harrington, Don Johnson, Randy Kimball, Roger and Virginia Leggett, Dick and Kathy MacPherson, John and Barbara Marnell, Dale McBride, Steve and Mary Mongrain, Phil Motz, Kib and Shirley Roby, and Carl Weikel.

Tuesday, May 2, 2006

Goffs Depot model completed


Report by Chris Ervin

John Harrington has completed a beautiful model of the Goffs Depot. This talented man put in nearly 400 hours constructing this large miniature over the past five months.

The model was built using historic documents and photos. It is so detailed that the roof can be lifted from the second story to reveal rooms inside.

The long, one-story freight building attached to the two-story depot had varying lengths over the years. For reasons of practicality, a shortened manifestation of the freight building was chosen for the model.

It is truly a wonderful contribution for visualizing how the finished Library will look. The model is currently on display in the Goffs Schoolhouse Museum.