Report by Chris Ervin
The MDHCA Board of Directors has determined it prefers to pursue hiring a general contractor to perform the construction of the Library building. To that end, a list of twelve general contractor candidates has been collected and compiled for review and additional follow-up.
Friday, June 8, 2007
Saturday, May 19, 2007
Electrical meter/distribution panel delivered
Report by Dennis Casebier
Robert Botich delivered a 400-amp panel and electrical conduit pipe to support the Library/Depot project. Mr. Botich secured a substantial discount on the panel benefitting the Association.
Robert Botich delivered a 400-amp panel and electrical conduit pipe to support the Library/Depot project. Mr. Botich secured a substantial discount on the panel benefitting the Association.
Monday, May 14, 2007
Building permit issued
Report by Chris Ervin
We have a building permit for the Library!
I took half a day off from work this morning to drive the 215-mile round trip from Orange County into Yucca Valley to pick up the permit and corrected plans from building inspector Gary Given at the San Bernardino County Building and Safety.
We have a building permit for the Library!
I took half a day off from work this morning to drive the 215-mile round trip from Orange County into Yucca Valley to pick up the permit and corrected plans from building inspector Gary Given at the San Bernardino County Building and Safety.
Saturday, May 5, 2007
Trench dug from Power House to Pump House
Sunday, April 22, 2007
Spring Encampment volunteer efforts
Report by Phil MotzIn anticipation of the Encampment, John Harrington had acquired the 4-inch, 2-inch, and 1-inch conduit for the electrical lines for the Power House and Pump House buildings. Robert Botich dropped off fluorescent fixtures for both buildings and a 100-amp panel for the Pump House.
The fire break west of the library site was established by a crew consisting of John Harrington, Red Brooke, Sharon Holmes, Larry Burkholder, Chris and Leslie Ervin, Kib and Shirley Roby, and Jackie Ridge.
Kib Roby manicured the new well site.
The conduit for the 400-amp incoming electrical service was put in place.
Saturday, April 7, 2007
New electrical service planned
Report by Dennis Casebier
Robert Botich, an electrician by trade, traveled from Corona to Goffs and met with Dennis Casebier, Phil Motz, and John Harrington to review Southern California Edison (SCE) electrical specifications and to plan out acquisition of 400-amp meter and circuit panel.
Robert Botich, an electrician by trade, traveled from Corona to Goffs and met with Dennis Casebier, Phil Motz, and John Harrington to review Southern California Edison (SCE) electrical specifications and to plan out acquisition of 400-amp meter and circuit panel.
Saturday, March 17, 2007
Pump House materials run
From the Mojave Road Report
Dennis Casebier, John Harrington, and Ron Shepard pulled the Big Tex trailer to Bullhead City to procure lumber and other materials for the new Pump House. Construction was commenced today by Ron Shepard and John Reiff.
Dennis Casebier, John Harrington, and Ron Shepard pulled the Big Tex trailer to Bullhead City to procure lumber and other materials for the new Pump House. Construction was commenced today by Ron Shepard and John Reiff.
Thursday, March 15, 2007
Power House roofed
From the Mojave Road Report
Ron Shepard and John Reiff put roofing on the new Power House.
Ron Shepard and John Reiff put roofing on the new Power House.
Wednesday, March 14, 2007
Pump House pour
From the Mojave Road Report
John Harrington, John Reiff, Ron Shepard, and Carl Weikel poured the concrete slab for the new Pump House and also a step at the new Power House.
John Harrington, John Reiff, Ron Shepard, and Carl Weikel poured the concrete slab for the new Pump House and also a step at the new Power House.
Trench dug from street to Power House
Saturday, March 10, 2007
We con duit
From the Mojave Road Report
Bobby and Tom Smith and Don Johnson were here working on a ditch for the conduit that will carry the new electrical service to the new Power House. Tom also did maintenance on the Greening tractor.
Bobby and Tom Smith and Don Johnson were here working on a ditch for the conduit that will carry the new electrical service to the new Power House. Tom also did maintenance on the Greening tractor.
Friday, March 2, 2007
Pump House preparation
From the Mojave Road Report
John Harrington commenced work on the foundation forms for the Pump House that will support the new well. John Reiff finished restoration fo the Slaughter cement mixer. Its first job will be to pour the Pump House foundation.
John Harrington commenced work on the foundation forms for the Pump House that will support the new well. John Reiff finished restoration fo the Slaughter cement mixer. Its first job will be to pour the Pump House foundation.
Monday, February 26, 2007
Power House roof
From the Mojave Road Report
Ron Shepard and John Reiff worked on installing the roof for the Power House.
Ron Shepard and John Reiff worked on installing the roof for the Power House.
Thursday, February 22, 2007
Power House hip roof
From the Mojave Road Report
By the end of the day, most of the framing of the hip roof was in place.
By the end of the day, most of the framing of the hip roof was in place.
Wednesday, February 21, 2007
Power House construction begins
Report and photos by Dennis CasebierWednesday
We procured the materials for the 10' X 12' Power House yesterday. Today "The crew" went to work on getting the wall framing up and most of the wooden materials. From left to right; Bob Beal, Dorothy Beal, John Harrington, Ron Shepard, John Rieff.
They also painted the structure with an undercoat as protection against warping. Hope we have another nice day tomorrow!
Tuesday, February 20, 2007
Power House preparation
From the Mojave Road Report
A detachment consisting of Bob Beal, John Harrington, and Dennis Casebier, pulled the Big Tex trailer down to Home Depot in Bullhead City. They loaded it with almost all of the materials that will be needed for construction of what we've been calling the "Power House" that will serve the new Library/Depot building.
It measures 10' X 12' and will feature an old-time hip roof. That same day, Dorothy Beal, Bob Beal, and John Harrington commenced putting an undercoat of paint of the newly purchased boards to keep them from warping.
A detachment consisting of Bob Beal, John Harrington, and Dennis Casebier, pulled the Big Tex trailer down to Home Depot in Bullhead City. They loaded it with almost all of the materials that will be needed for construction of what we've been calling the "Power House" that will serve the new Library/Depot building.
It measures 10' X 12' and will feature an old-time hip roof. That same day, Dorothy Beal, Bob Beal, and John Harrington commenced putting an undercoat of paint of the newly purchased boards to keep them from warping.
Thursday, February 15, 2007
Well is completed
Report by Dennis CasebierThe new well is completed. The concrete collar around the well head has been poured. The pump is installed and the pressure tank is in place.
Water stands in the new well at 580 feet with the pump set at 800 feet. Testing of the well will have to wait for the new electrical service.
Leftover concrete from the pouring of the well collar was donated by Eagle Drilling and used to fill in a 10’ X 12’ form for the new Power House slab. This small building will house the new electrical service for the Library.
Wednesday, February 14, 2007
Deep well pump installed
From the Mojave Road Report
The pump crew from Eagle Well Drilling was here. They installed the deep well pump, riser, electrical connections, and pressure tank. With those additions the well is completed. The well is 830 feet deep with the pump set at 800 feet. It appears to be a good well but we won't know for sure until we get the proper electrical line out there to test it.
The pump crew from Eagle Well Drilling was here. They installed the deep well pump, riser, electrical connections, and pressure tank. With those additions the well is completed. The well is 830 feet deep with the pump set at 800 feet. It appears to be a good well but we won't know for sure until we get the proper electrical line out there to test it.
Tuesday, February 13, 2007
Well concrete collar poured
From the Mojave Road Report
Eagle Well Drilling was here with a concrete truck Barstow. The concrete sleeve that must be poured alongside the casing down fifty feet was poured. They also poured the concrete collar and pad at the new well site.
They brought a full load of concrete when only half was needed. The rest was used by John Reiff, Ron Shepard, and Carl Weikel who were busy pouring cement for the new Power House slab and other projects around the property.
Eagle Well Drilling was here with a concrete truck Barstow. The concrete sleeve that must be poured alongside the casing down fifty feet was poured. They also poured the concrete collar and pad at the new well site.
They brought a full load of concrete when only half was needed. The rest was used by John Reiff, Ron Shepard, and Carl Weikel who were busy pouring cement for the new Power House slab and other projects around the property.
Monday, February 12, 2007
Power House forms
From the Mojave Road Report
Final forms, in anticipation of concrete, are set for the new Power House which will serve the new Library and the north end of the Goffs Cultural Center
Final forms, in anticipation of concrete, are set for the new Power House which will serve the new Library and the north end of the Goffs Cultural Center
Saturday, January 20, 2007
Desert tortoise exclusion enclosure survey
Report and photo by Chris ErvinWildlife biologist Larry Sip checks GPS coordinates while performing the survey of the desert tortoise exclusion fence surrounding the Library/Depot building site. The fence is designed to ensure no tortoises wander into the construction zone and therefore keeps them out of harm's way. This survey by a qualified biologist fulfills a County requirement for compliance with our conditional use permit and the state environmental quality act.
Friday, January 12, 2007
Well casing cleaned out
From the Mojave Road Report
The well drillers came back today for just a day. It was cold and windy and we didn't know it then but the great cold snap of 2007 was on its way. They got the casing blown out and declared we have good water well. Then they cleaned up and took some of their equipment back to Newberry Springs.
The well drillers came back today for just a day. It was cold and windy and we didn't know it then but the great cold snap of 2007 was on its way. They got the casing blown out and declared we have good water well. Then they cleaned up and took some of their equipment back to Newberry Springs.
Tuesday, January 2, 2007
Well bottom reached
After a long break, Eagle Well Drilling was back on the job starting today through January 8. There was a lot of wind and cold weather while they were here, but they managed to get to the bottom and have the casing installed.
We had planned to go down to 850 feet, but at 835 feet or so we were at solid rock. It wasn't likely the quality of the well could beimporved by going deeper, so we called a halt.
The casing is set at 830 feet. Water typically stands at 560 feet in Goffs, so we are into plenty of water.
Saturday, December 30, 2006
Desert tortoise fence erected
From the Mojave Road Report
The following volunteers worked on erecting desert tortoise exclusion fence around building sites at the Goffs Cultural Center; Chris Ervin, Leslie Ervin, Don Johnson, Tom Smith, Harry Ridge, John Harrington, and Phil Motz,
The following volunteers worked on erecting desert tortoise exclusion fence around building sites at the Goffs Cultural Center; Chris Ervin, Leslie Ervin, Don Johnson, Tom Smith, Harry Ridge, John Harrington, and Phil Motz,
Saturday, December 16, 2006
Cultural resources survey conducted
Report by Chris ErvinPhoto by Dennis Casebier
Archaeologists Russell L. Kaldenberg, MA and Judyth E. Reed, MA, walked the entire site to identify cultural resources which might occur on the footprint of the new library.
The site was intensively walked, zigzagging back and forth, looking for anything that might be over 50 years of age. The grounds were found to be neat and tidy and no scrap of any trash, debris, or negligent waste was expected.
The survey produced predictable results. No archaeological or historical materials were found within the footprint of the building site. No materials were found in any of the construction zones or laydown areas, which are adjacent to the footprint of the building, but adjoin the area to be disturbed.
No mitigation measures were recommended as there were no cultural resources, either prehistoric or historic, in or near the footprint of the building site.
This survey fulfills a County requirement for compliance with our conditional use permit and the state environmental quality act.